Macomb and Oakland County
Bathroom remodeling done by the person who inspects it
A real bathroom remodel in Sterling Heights or Rochester Hills runs $20,000 to $95,000, depending on the size of the room and whether the layout changes. Mike Murphy is a licensed Michigan builder and an InterNACHI certified inspector, which matters most in a bathroom, where hidden water damage behind tile is the single most common budget-buster in the trade.
Bathroom remodeling
$20,000 to $95,000
A fixture and finish refresh sits at the low end. Layout changes, curbless showers, and primary suite expansions push toward the top.
Licensed MI builder
#242500021
InterNACHI certified inspector
#NACHI20042907
Rated on Google
5.0 stars, 5 reviews
Serving
Macomb, Oakland, N. Wayne
Recent work
What these look like when they are done.






What a bathroom remodel actually involves
Bathrooms fail differently than any other room in the house, because water finds its way behind tile and under subfloors for years before anyone notices. That's the reason bathroom remodels have a reputation for blown budgets: a contractor tears out a tub surround expecting to find sound subfloor and finds soft, rotted plywood instead. Mike inspects homes for a living, so when he pulls tile in a 1980s Rochester Hills colonial, he already has a good read on whether the subfloor underneath is going to be a problem before the demo crew gets there, and he prices for it up front instead of hitting you with it as a change order.
A full remodel touches plumbing rough-in, electrical (GFCI circuits, exhaust fan venting, often new lighting), waterproofing, tile, and fixtures. The scope of work depends heavily on what you're starting with. Reglazing or refinishing an existing tub and swapping fixtures is a light job. Converting a tub to a curbless walk-in shower, moving the toilet or vanity, or combining two small bathrooms into one primary suite bath is a full renovation with real plumbing and sometimes structural work involved.
Ventilation is worth calling out specifically because it's the thing most DIY and budget remodels skip, and it's the reason bathrooms grow mold. Michigan code requires mechanical exhaust venting to the exterior, not just into the attic. We verify the vent run terminates outside on every job, because a fan that just dumps humid air into an attic cavity causes exactly the kind of moisture damage that shows up on a home inspection five years later.
Realistic cost ranges for 2026
A fixture and finish update (new vanity, toilet, fixtures, tile, keep the existing layout and tub or shower footprint) runs $20,000 to $35,000 for a typical secondary bathroom. A full remodel that reconfigures the layout, converts a tub to a shower, or upgrades a powder room to a full bath runs $35,000 to $65,000. A primary suite bathroom, especially one that expands the footprint, adds double vanities, a freestanding tub, and a large curbless shower, runs $65,000 to $95,000 in this market.
Tile and stone are usually the biggest single line item after labor, particularly for large-format porcelain or natural stone showers with a linear drain. Custom glass shower enclosures and heated floors are the two upgrades that most often push a bathroom to the top of its range without anyone quite meaning for it to happen, so we itemize them separately in every estimate so you can see exactly what they cost before committing.
Timeline
A fixture and finish update runs 2 to 3 weeks. A full remodel with the same footprint runs 4 to 6 weeks. A remodel that reconfigures the layout, moves plumbing, or expands the room runs 6 to 10 weeks, largely because tile work can't be rushed, waterproofing membranes need cure time, and custom vanities and glass enclosures carry their own lead times.
Permits in Macomb and Oakland counties
Any bathroom work that moves plumbing, adds electrical circuits, or changes the structure requires a permit from the city or township, and Michigan plumbing code requires a licensed plumber's permit for supply and drain line work specifically. A straightforward fixture swap in the same locations typically doesn't need one. We handle every permit application and inspection on jobs that require it, so it never lands on your desk.
What commonly goes wrong, and how it gets avoided
Rotted subfloor under an old tub, hidden mold behind tile that was never properly waterproofed, and undersized exhaust venting are the three problems that blow bathroom budgets and timelines. All three are things Mike is trained to spot as an inspector before a single tile comes off the wall. We also see a lot of bathrooms where a previous owner did DIY tile work directly over drywall instead of cement board or a proper waterproofing membrane, which looks fine for a year or two and then fails. We check for that at the estimate stage whenever we're working over an existing tub or shower pan.
The other common issue is ventilation fans vented into the attic instead of outside, which we mentioned above. It's an easy thing to miss if you're not looking for it, and it's the kind of detail that separates a contractor from someone who also does home inspections for a living.
What's included, what's not
Included: demo and haul-away, plumbing and electrical rough-in and finish, waterproofing membrane, tile installation, vanity and fixture installation, exhaust fan and venting, and final trim. Not included by default: freestanding tubs and designer fixtures beyond a standard allowance (we'll spec exactly what's covered in your estimate), and structural work if the layout expansion requires moving a wall that's load-bearing, which we'll flag during the walk-through if it applies.
Bathroom Remodeling questions we get
What does a $10,000 bathroom remodel look like?
It covers a new vanity, toilet, faucet, mirror, light fixture, and paint, keeping the existing tub or shower and tile in place. That's a real, worthwhile update for a secondary bathroom that's just dated, not damaged. It does not cover new tile, a reconfigured layout, or a tub-to-shower conversion, all of which involve plumbing and waterproofing work that pushes past that budget quickly.
How much does it cost to remodel a bathroom in Michigan?
In Macomb and Oakland counties, a full bathroom remodel runs $20,000 to $95,000 depending on size and scope. A fixture update on an existing layout runs $20,000 to $35,000. A primary suite remodel with an expanded footprint and custom shower runs $65,000 and up. The range is wide because bathroom size and plumbing complexity vary more than in almost any other room.
Is it worth converting a bathtub to a walk-in shower?
It depends on the house and who lives in it. It's a strong resale move in a primary suite where there's a second tub elsewhere in the house, and it's a common request for aging-in-place. If it's the only tub in the house, we'll usually flag that for you before you commit, since it can affect resale to buyers with young kids.
How long does a bathroom remodel take?
2 to 3 weeks for a fixture and finish update, 4 to 6 weeks for a full remodel on the existing footprint, and 6 to 10 weeks if the layout is changing or plumbing is being relocated. Tile and waterproofing cure times are the main thing that keeps a bathroom job from being rushed.
Do I need a permit to remodel a bathroom in Michigan?
Yes, if the work touches plumbing supply or drain lines, adds electrical circuits, or changes the room's structure. A cosmetic swap of fixtures in the same locations usually doesn't need one. We pull and manage every permit a job requires.
What's the biggest mistake homeowners make planning a bathroom remodel?
Assuming the subfloor and framing behind the existing tile are in good shape without checking. It's the single most common source of surprise costs in this trade. Having your contractor also be a certified inspector means that gets assessed honestly before demo, not discovered halfway through.
Also worth reading
The rest of what we do.
Where we work
Cities we cover most.
Want a real number on your bathroom remodeling?
Mike walks the space, looks behind it, and writes you a scope with the line items visible. Free, and there is no sales sequence after.